The new porcelin tile floor - installed and grouted.
		We had to rip out 1" of concrete base and install
		additional 3/4" subfloor over the existing 1/2"
		Then install 1/2" cement backerboard with
		thinset and backerboard scews.
		timestamp:  2001:09:16 15:00:57
		focal length:   8.2mm
		F stop:  2.4
		exposure time: 10/27s